Commissioning

Systems commissioning and testing

Commissioning checks, through tests and trials, that building services work as designed, together and before occupancy. We verify how HVAC, DHW, electrical, telecoms and fire safety systems work and integrate, against a commissioning plan, before occupancy.

What we do

End-to-end commissioning

Each discipline has its own procedures and acceptance criteria, set in the commissioning plan before construction starts.

HVAC

Measurement of air flows, supply temperatures, differential pressures, noise levels, and the operation of valves and dampers. Portaria 138-I/2021 (testing and balancing) · DL 101-D/2020

Domestic hot water

Outlet temperature, flow, recirculation, Legionella protection and validation of the solar thermal system or heat pump.

Electrical

Insulation resistance, earth continuity, residual-current protection and thermography of switchboards. RTIEBT (part 6 — verification)

Telecommunications

Structured cabling certification, optical-fibre attenuation measurement and Wi-Fi coverage tests. ITED Manual 4 · ITUR

Fire safety

Testing of detectors, manual call points, sounders, the fire panel, automatic suppression and smoke control set out in the test plan. DL 220/2008 · Portaria 1532/2008

Integrated tests

Systems working together: fire detection and smoke control, changeover to emergency power, the building management system and failure scenarios.

Our process

How we work

Five stages, from the commissioning plan to handing the building over to the operations team.

01

Planning

We prepare the commissioning plan before construction starts: objectives, systems to commission, test procedures and acceptance criteria.

02

Installation verification

We check how equipment is installed: mechanical fixing, electrical connections, labelling and maintenance access.

03

Individual functional tests

We test each item of equipment and each system: flows, temperatures, pressures, electrical protection, cabling certification and detection.

04

Integrated tests

We test how the systems work together, the automatic sequences and the failure scenarios.

05

Training and handover

Training for the operations and maintenance team, compiled manuals, the commissioning report and a preventive maintenance plan.

Reference standards

Based on international best practice

Portaria 138-I/2021Testing and balancing of installations after completion and before entry into service.
RT-SCIE (EN 54)Fire detection and alarm systems — verification procedures.
DL 101-D/2020Verification requirements for technical systems within the scope of energy performance.
RTIEBT (Portaria 949-A/2006)Technical Rules for Low-Voltage Electrical Installations. Applicable to the design, execution and verification of all LV electrical installations in Portugal.
ITED 4 Manual · ITURANACOM manuals for telecommunications infrastructure in buildings (ITED, 4th edition) and developments (ITUR). They set out design, installation and certification requirements.
Law 52/2018 · DL 69/2023Law 52/2018 and Ministerial Order 25/2021 — prevention and control of Legionnaires' disease. For building water systems, including domestic hot water, the law covers buildings open to the public and, save for the exceptions it sets out, excludes buildings used mainly as housing or offices; cluster and outbreak procedures apply to all. Decree-Law 69/2023, as amended by Decree-Law 149/2026 — drinking-water quality and risk assessment of domestic distribution systems in priority premises.
Benefits

What you gain with commissioning

🏢

Systems tested before occupancy

Air conditioning, lighting, networks and safety systems are tested before occupants move in.

💰

Lower cost of fixes

Problems identified during commissioning cost a fraction of what they would cost after occupancy.

👥

A prepared team

Training of the maintenance team supports the ongoing operation and maintenance of the systems.

📄

Reference documentation

The commissioning report is the baseline for all future maintenance and operation of the building.

FAQ

Frequently asked questions about commissioning

What is commissioning in engineering?

It is the process that follows building services from design to start-up and confirms with tests that each system, and the integration between systems, meets the requirements set by the client.

What is equipment commissioning?

It is the part that tests each piece of equipment (HVAC units, pumps, switchboards, fire detection panels) and confirms start-up, settings and controls, recording the results.

When is commissioning carried out?

It is planned at design stage and carried out at the end of the works, before handover, with tests of each system and of the integration between them.

How much does commissioning cost?

It depends on the size and type of building, the scope required and the level of detail. We prepare the proposal after receiving the documents (installation design and list of systems to test), to make sure what we propose fits what you need.

How do I request a proposal or contact you?

You can request a quote or an online consultation in the Client Room, write to geral@afazerescuriosos.pt, call +351 21 145 1077, message us on WhatsApp or book a preliminary call to frame your request.

Digital pressure analyser and gauges connected by red and blue hoses to insulated pipework
Next steps

How would you like to validate the operation of your systems?

If you already know which service you need, request a quote. If you first need to weigh up alternatives or clarify a specific question, choose online consultancy.

Would rather talk to us first? See contacts