MEP Systems Commissioning

Commissioning, testing, functional testing, start-up, verification and validation of MEP, HVAC, electricity, Fire safety, DHW and telecommunications installations.

MEP Engineering · Commissioning

Installation commissioning: ensuring everything works as designed

We carry out the commissioning of HVAC, DHW, electricity, telecommunications and Fire safety installations, ensuring that each system and the building as a whole function correctly before occupancy.

Commissioning
The 5 phases

Structured commissioning methodology

Our process follows international best practices (ASHRAE Guideline 0) in five sequential phases.

Phase 1 — Planning

We prepare the commissioning plan before the start of the work: objectives, systems to be commissioned, test procedures and acceptance criteria.

Phase 2 — Installation verification

We check that the equipment is correctly installed: mechanical assembly, electrical connections, labeling and accessibility for maintenance.

Phase 3 — Individual functional tests

We test each equipment and system individually: flow rates, temperatures, pressures, electrical protections, cabling certification, detection tests.

Phase 4 — Integrated tests

We test joint operation: SADI + smoke control, emergency switching, integrated BMS, failure scenarios and automatic sequences.

Phase 5 — Training and delivery

Training of the operation and maintenance team, delivery of compiled manuals, commissioning report and preventive maintenance plan.

Discipline-by-discipline testing

Every system tested rigorously

Each discipline MEP has its own procedures and acceptance criteria defined in the planning phase.

HVAC

Compliance with NP EN 12599

Measurement of air flow rates, supply temperatures, differential pressures, noise levels, operation of valves and registers. NP EN 12599 · DL 101-D/2020

DHW

Hot water production and distribution

Tests for outlet temperature, flow rate, recirculation, protection against Legionella (EN 806-2) and validation of solar thermal systems or heat pumps. EN 806-2 · DL 58/2013 · EN 12975

Electrical Systems

Complete electrical tests

Insulation resistance, earth continuity, differential protections and thermography of electrical panels. RTIEBT · IEC 60364-6 · NP EN 61557

Telecommunications

Cabling and network certification

Structured cabling certification (Cat. 6A/7), optical fiber attenuation measurement and Wi-Fi coverage testing. Manual ITED 3 · ITUR · EN 50173-1

Fire safety

100% device testing

Testing all detectors, manual triggers, sirens, fire control, automatic extinguishing and smoke control. DL 220/2008 · Portaria 1532/2008 · NP 4513

Reference standards

Based on international best practices

NP EN 12599Test procedures and measurement methods for acceptance of ventilation and air-conditioning systems.
ASHRAE Guideline 0 e 1.1International references for building commissioning best practices.
ISO 14644Cleanrooms and controlled environments for healthcare and laboratory facilities.
EN 12101Smoke and heat control systems - tests and acceptance criteria.
EN 54 (series)Fire detection and alarm systems - verification procedures.
DL 101-D/2020Verification requirements for technical systems under energy performance rules.
RTIEBT (Portaria 949-A/2006)Technical Rules for Low-Voltage Electrical Installations. Applicable to design, execution and verification of all LV electrical installations in Portugal.
Manual ITED 3 · ITURANACOM manuals for telecommunications infrastructure in buildings (ITED 3rd edition) and developments (ITUR). They define design, installation and certification requirements.
EN 806-2 · DL 58/2013Technical specifications for drinking-water systems - network sizing, minimum storage temperatures and Legionella protection protocol for domestic hot water.
Benefits

What you gain from commissioning

🏢

Functional building from day one

Occupants will find comfortable air conditioning, adequate lighting, operational networks and active safety.

💰

Reduced correction costs

Problems identified during commissioning cost a fraction of what they would cost after occupancy.

👥

Prepared team

Training the maintenance team ensures that systems are operated correctly, extending their useful life.

📄

Reference documentation

The commissioning report is the baseline for all future maintenance and operation of the building.

Ensure that your building is delivered functioning, not just looking finished.

Contacte-nos em geral@afazerescuriosos.pt para discutir o comissionamento das suas instalações.