Construction supervision

Construction supervision and technical verification

Technical site monitoring, execution verification, reporting and document management for MEP installations, with scope and frequency defined for each project.

What we do

Full technical supervision

We cover the entire construction cycle, from first-fix infrastructure to final acceptance.

Compliance verification

We check that materials, equipment and installation methods comply with the design and the specifications.

Quality control

We verify execution quality at every stage, from embedded first-fix through to final finishes.

Change management

We review and validate contractors' change proposals, assessing the technical, regulatory and financial impact.

Schedule control

We monitor progress of the technical installations against the schedule, identifying deviations and proposing corrective action.

Tests and inspections

We require, oversee and validate all tests set out in the specifications and applicable regulations.

Document management

Material approval sheets, photographic records, measurement reports, test sheets and as-built drawings.

Our process

Present at every critical stage

Supervision begins before construction starts — and ends with the complete documentation handed over to the client.

01

Supervision planning

We review the design and specifications, and define the critical inspection points and acceptance criteria for each type of work.

02

First-fix stage

We check drilled openings, blockouts, cable routes and embedded pipework before ceilings and walls are closed — the most critical stage.

03

Equipment installation stage

We check that the equipment received complies with the design and validate the installation of HVAC units, panels, racks and fire alarm control panels.

04

Testing and commissioning

We oversee all tests: tightness, pressure, electrical measurements, fire-detection testing and cabling certification.

05

Provisional and final acceptance

We prepare punch lists, follow up on defect resolution and validate final handover with all technical documentation compiled.

Regulatory references

Verification of the requirements of the disciplines under supervision

RTIEBTTechnical Rules for Low-Voltage Electrical Installations.
ITED/ITUR ManualTelecommunications — compliance with ANACOM standards.
EN 806-2 · DL 58/2013Domestic hot water — sizing, Legionella protection and water quality.
DL 220/2008 / Portaria 1532/2008Fire safety — RJ-SCIE and RT-SCIE.
DL 101-D/2020Verification requirements for technical systems and energy performance.
NP EN 12599Acceptance tests for air conditioning and ventilation installations.
Lei 40/2015Professional qualification of the technicians responsible for supervision.
Benefits

What you gain with Afazeres Curiosos

🛡️

Investment protection

We detect non-compliances before they become costly problems to fix.

📷

Verified quality

Every stage inspected and documented, creating a complete record of construction quality.

📊

Full transparency

Clear, regular reports that let you follow the project's progress and make informed decisions.

📁

Complete documentation

At the end of the project, the client receives an organised file with all the necessary technical documentation.

Next steps

How would you like to ensure the quality and compliance of your project?